More cabinets were installed
Downstairs in the bathroom.
And upstairs in the kitchen.
They did the little last bit of the lower cabinets so they could measure for the counter that will be coming later (probably mid-December).
Also, the sinks arrived for both the bathroom and the kitchen.
No comments:
Post a Comment