Wednesday, November 13, 2013

From The Walls To The Floors

Day 174

Work continues as they did more work on the shelves.  These are in the downstairs closet.


They also reinforced some shelves in the closet.


They also installed this door on the bathroom closet.


And then the floor.  They did the guest room closet.


Finished the threshold between the hall and the guestroom.


They also started on the great room floor.


They didn't quite squeeze them together yet.  See.


 They'll probably do that tomorrow.  The plan is that they are going to install the floor.  Sand some of the old floor down and then stain to match the finish.  I'm liking the way things are looking.

No comments:

Post a Comment